Ramadan 2027 is expected to run from 8 February to 8 March 2027, with Eid al-Fitr around 9 March, subject to the official moon sighting. World KNK is a woven clothing manufacturer in Bandung, Indonesia, taking Ramadan production orders from 1,000 pieces per style, with 6 to 12 week bulk lead times and around 200,000 pieces a month of capacity across the group.
Orders for the season are placed now: sampling in November, fabric on the loom by December, bulk cutting from January. This page sets out how a Gulf Ramadan programme runs, the numbers behind it, and the deadlines that decide whether your stock lands before Eid.
Ramadan 2027 planning sheet
| Ramadan 2027 dates | Expected 8 February to 8 March 2027 (1448 AH); Eid al-Fitr around 9 March; confirmed by moon sighting |
| Latest safe booking | Mid-November 2026 for a pre-Eid delivery; December and January narrow the options |
| Minimum order | 1,000 pieces per style (1,500 where custom fabric development is needed) |
| Sampling | 1 to 2 weeks per round |
| Bulk production | 6 to 12 weeks |
| Capacity | Around 200,000 pieces per month across the group |
| Market reference | Custom Eid abaya listings on Global Sources ask about US$15.50 per piece at 2,000-piece minimums (seller ask, not our price) |
| Figures checked | 29 September 2026 |
When is Ramadan 2027, and when should Gulf brands place production orders?
Ramadan 1448 AH is expected to begin on Monday 8 February 2027, with Eid al-Fitr around 9 March. Calendars such as IslamicFinder and timeanddate agree on those dates, and each carries the same caveat: the official start follows the moon sighting and can move by a day.
The production clock matters more than the calendar. Work backwards from the shelf date:
- Bulk production needs 6 to 12 weeks in our Bandung factory.
- Sampling takes 1 to 2 weeks per round, and a focused brand settles a style in two rounds.
- Custom fabric development adds 4 to 8 weeks before cutting starts.
- Freight from Java to Gulf ports adds its own weeks, and Saudi consignments clear through SABER.
A stockist who wants garments on the water by mid-January needs sampling finished by late November. This is why the Gulf buying season opens in October: brands that confirm styles and quantities in October and November get first pick of capacity slots, and brands that wait until January take what is left. Our Ramadan 2027 production calendar walks the same timeline month by month.
Gulf retailers typically begin Ramadan campaigns about three months before the month starts, which puts the 2027 campaign launches in November 2026. Stock that arrives inside the campaign window sells at full price; stock that arrives after it discounts.
What Gulf brands order for Ramadan
The season’s order book runs on modest wear, and the backbone of it is woven:
- Abayas: open-front, kimono and farasha cuts, closed designs, and embroidery-heavy evening pieces.
- Jalabiyas and kaftans: loose silhouettes, statement sleeves, embellishment at the neckline.
- Thobes: men’s and boys’ daily wear, where collar and placket consistency across thousands of units is the hardest test at volume.
- Prayer sets and occasion pieces that complete an Eid capsule.
Fabrics follow the market’s preferences: Nida and satin-finish crepe are the premium abaya staples, with chiffon layers, jacquard and matte crepe filling out the range. We are a woven specialist: fabric arrives in rolls, panels are cut to a Lectra-planned marker, and grading stays consistent across the size run, which matters when one style ships in six sizes and four colourways. Brand labels, hangtags and packaging are produced to your artwork, so private label is part of the programme rather than an add-on. The dedicated abaya manufacturer Indonesia page covers the OEM and private-label programme in full.
The published minimum is per style; how it splits across colourways comes back with your quote, so list your colourways when you ask. Name your candidate fabrics in the same enquiry and the sampling plan carries the fabric approvals that come before bulk. For programmes below our 1,000-piece floor, our sister company Kizen Lab runs small-batch production from 500 pieces, a common size for a first Ramadan capsule.
How a Ramadan 2027 production order runs
- Styles and tech pack (October). Confirm styles, quantities and size ratios, and lock the tech pack. A confirmed order beats a January maybe: sewing capacity is allocated months ahead, and weeks are held against your purchase order.
- Sampling (November). One to two weeks per round, with photo updates as the round moves. Our guide to sample fees covers what factories charge and why.
- Fabric (November to December). Stock fabrics move fastest. Custom development starts at 1,500 pieces and adds 4 to 8 weeks while mills weave to your composition. Minimum orders exist because mills and cutting-room setup work that way.
- Bulk production (December to February). Six to twelve weeks depending on construction and finishing. Our lead time guide explains what moves a schedule and what does not.
- Inspection and shipping (January to February). Final inspection against the approved seal sample, packing to the carton plan, and the FOB handover at the port where your forwarder takes over for the Gulf leg.
- Arrival ahead of the campaign peak. Split deliveries are common when a launch needs part of the order early; each shipment adds its own freight and clearance lines, so decide the split against the launch plan.
What does a Ramadan 2027 programme cost?
Factories rarely publish per-piece prices, and the market’s own listings show why the ranges run wide. Asks across Alibaba listings span about US$7.90 to US$32 for wholesale abayas. Basic printed styles ask US$12 to US$14, premium beaded pieces around US$65, and a Global Sources listing for custom Eid abayas asks US$15.50 per piece at a 2,000-piece minimum. Those figures are seller asks, not transaction prices, and none of them carry a factory’s fabric, trim or finishing choices.
The direct route to a number is a quote built on your tech pack, because fabric, construction, embroidery density and finishing all move the per-piece figure. Request a quote with your styles and quantities, and our cost per piece benchmarks show how each element is priced before you commit.
Getting Ramadan stock through Gulf customs
- Saudi Arabia. Consignments clear through the SABER platform, which needs a Product Certificate of Conformity registered per product and a Shipment Certificate of Conformity issued per shipment, both through SASO-approved certification bodies. Your importer of record arranges this; leave a week or two of the schedule for it.
- Arabic labelling. The Saudi textile rules require labels in Arabic stating fibre composition with percentages, manufacturer or supplier, country of origin and care instructions. Care labels are a production-line output, so they print to your importer’s requirements as part of the making, not as a scramble before the container closes.
- Halal documentation. No Gulf market legally requires halal certificates for clothing, but some buyers ask for mill and composition documents as part of their file. Fabric composition and mill details can be documented for your file on request.
- Duties and VAT. The UAE applies the GCC standard 5 percent on apparel plus 5 percent VAT, which on a US$20,000 FOB order lands close to a 10.3 percent uplift on the invoice. Saudi Arabia sits on the same GCC tariff with some lines raised since 2020, plus 15 percent VAT. Confirm the exact rate for your HS codes with your broker.
Why an Indonesian clothing manufacturer fits a season as tight as Ramadan 2027
Gulf buyers weigh three sourcing routes. Dubai quick-turn houses take 10 to 200 pieces and ship ready stock in days, which suits a trial order, not a season. Marketplace OEM listings run to 2,000-piece minimums with no named factory behind the listing. A Ramadan programme needs a third option: named capacity, consistent grading, and lead times a planner can book against.
That is the lane we work in. Around 200,000 pieces a month across the group, nearly 1,000 people, producing from Bandung since 2000, with Lectra pattern-making keeping size runs consistent from sample to bulk. You can see the floor in our Bandung factory tour, and the capacity booking page explains how weeks are held against purchase orders.
Ramadan 2027 production questions
The Gulf apparel buyer FAQ page answers the customs, fabric, halal and private-label questions in one place.
What is the minimum order for a Ramadan production run?
1,000 pieces per style for woven garments at World KNK, or 1,500 where custom fabric development is needed. Our sister company Kizen Lab produces small batches from 500 pieces.
Can I get samples before committing to bulk?
Yes. Sampling runs one to two weeks per round, and two rounds settle most styles. Our sample fees guide explains the charges and how other buyers handle them.
Do you support private label for abayas and modest wear?
Brand labels, hangtags and packaging are produced to your artwork on every programme. Our private label page covers what we need from you and when.
Who handles SABER certification for Saudi Arabia?
Your importer of record arranges the Product and Shipment Certificates of Conformity through SASO-approved bodies. The factory supplies the production documents behind them, and the schedule should carry a week or two for the paperwork.
What if I am only starting in December or January?
A pre-Eid delivery of a new development is unlikely by then. The workable moves are stock fabrics, simpler trims, a post-Eid slot once production staff are back after Eid, or a split order that ships part before Eid. The production calendar page walks through each.
Can one order deliver before Eid and after it?
Yes, and it is a common structure. Each extra shipment adds its own freight and clearance line, so decide the split against the launch plan.
Sewing capacity for the season is allocated months ahead, and the weeks between now and December decide what is still open in January. Send your styles and quantities through the quote page or contact us directly, and keep the Ramadan 2027 production calendar beside your planning sheet.
يُتوقع أن يمتد رمضان 2027 من 8 فبراير إلى 8 مارس 2027، مع عيد الفطر نحو 9 مارس، رهناً برؤية الهلال الرسمية. World KNK مصنع ملابس منسوجة في باندونغ بإندونيسيا، يستقبل أوامر إنتاج رمضان ابتداءً من 1,000 قطعة لكل موديل، بمواعيد إنتاج للكميات تتراوح بين 6 و12 أسبوعاً، وطاقة إنتاجية تقارب 200,000 قطعة شهرياً على مستوى المجموعة.
توضع أوامر الموسم الآن: العينات في نوفمبر، والأقمشة على النول في ديسمبر، والقص بالجملة اعتباراً من يناير. توضح هذه الصفحة كيف يسير برنامج رمضاني خليجي معنا، والأرقام التي يقوم عليها، والمواعيد النهائية التي تحدد وصول بضاعتك قبل العيد.
ورقة تخطيط رمضان 2027
| تواريخ رمضان 2027 | من 8 فبراير إلى 8 مارس 2027 تقريباً (1448هـ)؛ عيد الفطر نحو 9 مارس؛ يُثبَّت برؤية الهلال |
| آخر موعد حجز مأمون | منتصف نوفمبر 2026 للتسليم قبل العيد؛ يضيّق ديسمبر ويناير الخيارات |
| الحد الأدنى للطلب | 1,000 قطعة لكل موديل (1,500 عند تطوير قماش خاص) |
| العينات | من أسبوع إلى أسبوعين لكل جولة |
| الإنتاج بالجملة | من 6 إلى 12 أسبوعاً |
| الطاقة الإنتاجية | نحو 200,000 قطعة شهرياً على مستوى المجموعة |
| مرجع السوق | إدراجات العبايات المخصصة للعيد على Global Sources تطلب نحو 15.50 دولاراً للقطعة بحد أدنى 2,000 قطعة (طلب بائع، وليس سعرنا) |
| آخر تحقق للأرقام | 29 سبتمبر 2026 |
متى يبدأ رمضان 2027، ومتى تضع العلامات الخليجية أوامر الإنتاج؟
يُتوقع أن يبدأ رمضان 1448هـ يوم الاثنين 8 فبراير 2027، مع عيد الفطر نحو 9 مارس. تتفق التقاويم المنشورة، مثل IslamicFinder وtimeanddate، على هذين التاريخين، وكلها تحمل التحذير نفسه: البداية الرسمية تتبع رؤية الهلال وقد تتقدم يوماً واحداً.
والساعة الإنتاجية أهم من التقويم. اعمل بالرجوع من تاريخ الرف:
- الإنتاج بالجملة يحتاج من 6 إلى 12 أسبوعاً في مصنعنا بباندونغ.
- العينات تستغرق من أسبوع إلى أسبوعين لكل جولة، وجولتان تكفيان غالباً لتثبيت الموديل.
- تطوير قماش خاص يضيف من 4 إلى 8 أسابيع قبل بدء القص.
- الشحن من جاوة إلى موانئ الخليج يضيف أسابيعه، وتخضع الشحنات السعودية للتخليص عبر منصة سابر.
من يريد بضاعته على الماء بحلول منتصف يناير عليه إنهاء العينات في أواخر نوفمبر. لهذا يفتح موسم الشراء الخليجي في أكتوبر: العلامات التي تثبّت الموديلات والكميات في أكتوبر ونوفمبر تنال أولى حصص الطاقة، وما يؤجل إلى يناير يأخذ ما تبقى. يستعرض تقويم إنتاج رمضان 2027 لدينا الجدول نفسه شهراً بشهر.
وتطلق تجارة التجزئة الخليجية حملات رمضان قبل نحو ثلاثة أشهر من بداية الشهر عادةً، أي أن حملات 2027 تنطلق في نوفمبر 2026. البضاعة التي تصل داخل نافذة الحملة تباع بسعرها الكامل، وما يصل بعدها يُخصَّم.
ما تطلبه العلامات الخليجية لرمضان
يعتمد دفتر طلبات الموسم على الملابس المحتشمة، وجذعها المنتجات المنسوجة:
- العبايات: القصات المفتوحة والكيمونو والفراشة، والموديلات المغلقة، وقطع السهرة المطرزة بكثافة.
- الجلابيات والقفاطين: قصات واسعة، أكمام مميزة، وتطريز عند فتحة الرقبة.
- الثياب: اللبس اليومي للرجال والأولاد، حيث يمثل ثبات الياقة واللوح أخطر اختبار اتساق عند الكميات الكبيرة.
- أطقم الصلاة وقطع المناسبات التي تكتمل بها كبسولة العيد.
وتتبع الأقمشة أفضليات السوق: النيدا والكريب الساتان أساس العباية الفاخرة، مع طبقات الشيفون والجاكار والكريب المطفي. نحن متخصصون في المنتجات المنسوجة: يصل القماش في لفائف، وتُقص القطع وفق تخطيط Lectra، ويبقى التقسيم متسقاً عبر سلسلة الأحجام، وهو ما يهم حين يشحن الموديل الواحد بستة مقاسات وأربعة تناسقات لونية. وتُنتج البطاقات التجارية واللافتات والتغليف وفق تصميمك، فالعلامة الخاصة جزء من البرنامج وليست إضافة. وتغطي صفحة مصنع العبايات في إندونيسيا برنامج OEM والعلامة الخاصة بالتفصيل.
الحد الأدنى المنشور هو لكل موديل؛ أما توزيعه على التناسقات اللونية فيعود مع عرض السعر، فاذكر تناسقاتك اللونية عند الطلب. واذكر أقمشتك المرشحة في الطلب نفسه لتحمل خطة العينات اعتمادات القماش التي تسبق الجملة. وللبرامج الأصغر من حد 1,000 قطعة، تتولى شركتنا الشقيقة Kizen Lab الإنتاج بكميات صغيرة من 500 قطعة، وهو حجم شائع لأول كبسولة رمضانية.
كيف يسير أمر إنتاج لرمضان 2027
- الموديلات وكتيّب المواصفات (أكتوبر). ثبّت الموديلات والكميات وتناسق المقاسات وأغلق كتيّب المواصفات. الطلب المؤكد خير من «ربما» في يناير: توزَّع أسابيع الخياطة قبل أشهر، وتُحجز أسابيعك بموجب أمر الشراء.
- العينات (نوفمبر). من أسبوع إلى أسبوعين لكل جولة، مع صور متابعة أثناء الجولة. يشرح دليل رسوم العينات لدينا ما تفرضه المصانع ولماذا.
- القماش (نوفمبر إلى ديسمبر). الأقمشة الجاهزة أسرع. أما التطوير الخاص فيبدأ من 1,500 قطعة ويضيف من 4 إلى 8 أسابيع بينما ينسج النول على تركيبك. الحد الأدنى للطلبات قائم لأن النول وإعداد غرفة القص يعملان هكذا.
- الإنتاج بالجملة (ديسمبر إلى فبراير). من ستة إلى اثني عشر أسبوعاً بحسب البناء والتشطيب. يشرح دليل مواعيد الإنتاج ما يحرك الجدول وما لا يحركه.
- الفحص والشحن (يناير إلى فبراير). فحص نهائي مقابل العينة المعتمدة، وتغليف وفق خطة الكراتين، ثم التسليم FOB في الميناء حيث يتولى معيد الشحن عنك رحلة الخليج.
- الوصول قبل ذروة الحملة. التقسيم إلى شحنات شائع حين يحتاج الإطلاق جزءاً من الطلب مبكراً؛ وكل شحنة تضاف لها خطوط شحن وتخليص خاصة بها، فاجعل القرار قرار إطلاق.
كم تكلفة برنامج إنتاج لرمضان 2027؟
نادراً ما تنشر المصانع أسعاراً للقطعة، وإدراجات السوق نفسها تفسّر اتساع النطاق. طلبات العبايات للجملة عبر إدراجات Alibaba تتراوح نحو 7.90 إلى 32 دولاراً للقطعة. الموديلات المطبوعة الأساسية تُطلب من 12 إلى 14 دولاراً، وقطع التطريز الفاخرة نحو 65 دولاراً، وإدراج على Global Sources لعبايات عيد مخصصة يطلب 15.50 دولاراً للقطعة بحد أدنى 2,000 قطعة. هذه طلبات بائعين لا أسعار صفقات، ولا يحمل أي منها قماش المصنع أو المشغولات أو خيارات التشطيب.
والطريق المباشر إلى رقم هو عرض سعر مبني على كتيّب مواصفاتك، فالقماش والبناء وكثافة التطريز والتشطيب كلها تحرك سعر القطعة. اطلب عرض سعر بموديلاتك وكمياتك، وتُظهر معايير التكلفة للقطعة لدينا كيف يُسعَّر كل عنصر قبل أن تلتزم.
إخراج بضاعة رمضان من جمارك الخليج
- السعودية. يخضع التخليص لمنصة سابر، وتشترط شهادة مطابقة المنتج (PCoC) مسجلة لكل منتج وشهادة مطابقة الشحنة (SCoC) لكل شحنة، وكلاهما عبر جهات التصديق المعتمدة من هيئة SASO. يتولى الترتيب المستورد الذي يثبّت السجل لديك؛ وخصص من الجدول أسبوعاً أو أسبوعين للأوراق.
- البطاقات العربية. تشترط أنظمة المنسوجات السعودية بطاقات بالعربية تبيّن تركيب الألياف بنسبها، والمصنع أو المورد، وبلد المنشأ، وتعليمات العناية. بطاقة العناية مخرج من خط الإنتاج، فتُطبع وفق متطلبات مستوردك ضمن الصنع نفسه، لا في اللحظة الأخيرة قبل إغلاق الحاوية.
- الوثائق الحلال. لا يشترط أي سوق خليجي شهادات حلال للملابس قانونياً، لكن بعض المشترين يطلبون وثائق النول وتركيب الأقمشة ضمن ملفهم. يمكن توثيق تركيب القماش وبيانات النول لملفك عند الطلب.
- الرسوم والضرائب. تطبق الإمارات رسم الاتحاد الخليجي القياسي 5% على الملابس مع ضريبة قيمة مضافة 5%، وهو ما يعادل على طلب FOB بقيمة 20,000 دولار إلى الإمارات ارتفاعاً قريباً من 10.3% على الفاتورة. وتجلس السعودية على التعرفة الخليجية نفسها مع رفع بعض البنود منذ 2020، وقيمة مضافة 15%. أكّد النسبة الدقيقة لبنود نموذجك الجمركي (HS) مع مخلّصك الجمركي.
لماذا تناسب الطاقة الإندونيسية موسماً ضاغطاً مثل رمضان 2027؟
يوزن المشترون الخليجيون ثلاثة طرق للتوريد. البيوت الدبي السريعة تستقبل من 10 إلى 200 قطعة وتشحن الجاهز خلال أيام، وهذا يناسب طلب تجربة لا موسماً. وإدراجات التصنيع على المنصات تصل إلى حد أدنى 2,000 قطعة دون مصنع مُسمّى خلف الإدراج. أما برنامج رمضان فيحتاج خياراً ثالثاً: طاقة مُسمّاة، وتقسيم مقاسات متسق، ومواعيد يستطيع المنظّم الحجز على أساسها.
هذا هو حقلنا: نحو 200,000 قطعة شهرياً على مستوى المجموعة، وقرب 1,000 شخص، وإنتاج من باندونغ منذ عام 2000، مع تخطيط أنماط Lectra الذي يبقي سلسلة المقاسات متسقة من العينة إلى الجملة. شاهد الورشة في جولة مصنع باندونغ، وتشرح صفحة حجز الطاقة كيف تُحجز الأسابيع بموجب أوامر الشراء.
أسئلة متكررة حول إنتاج رمضان 2027
وتجيب صفحة الأسئلة الشائعة للمشتري الخليجي عن أسئلة الجمارك والأقمشة والوثائق الحلال والعلامة الخاصة في مكان واحد.
ما الحد الأدنى لأمر إنتاج رمضاني؟
1,000 قطعة لكل موديل للمنتجات المنسوجة في World KNK، أو 1,500 عند تطوير قماش خاص. وتنتج شركتنا الشقيقة Kizen Lab كميات صغيرة من 500 قطعة.
هل يمكن طلب عينات قبل الالتزام بالجملة؟
نعم. تستغرق العينات من أسبوع إلى أسبوعين لكل جولة، وجولتان تثبتان معظم الموديلات. يشرح دليل رسوم العينات الرسوم وكيف يتعامل معها المشترون.
هل تدعمون العلامة الخاصة للعبايات والملابس المحتشمة؟
تُنتج البطاقات التجارية واللافتات والتغليف وفق تصميمك في كل برنامج. وتغطي صفحة العلامة الخاصة ما نحتاجه منك ومتى.
من يتولى شهادات سابر للسعودية؟
يتولاه المستورد الذي يثبّت السجل لديك عبر الجهات المعتمدة من SASO، ويوفر المصنع الوثائق الإنتاجية خلفها، مع أسبوع أو اثنين في الجدول للأوراق.
ماذا لو بدأت الآن في ديسمبر أو يناير؟
التسليم قبل العيد لتطوير جديد يصبح مستبعداً حينها. الخيارات العملية: أقمشة جاهزة، مشغولات أبسط، حصة بعد العيد بعد عودة فريق الإنتاج، أو طلب مجزأ يشحن جزءاً قبل العيد. يستعرض تقويم الإنتاج كل خيار.
هل يقبل الطلب الواحد تسليماً قبل العيد وبعده؟
نعم، وهو تركيب شائع. كل شحنة إضافية تضيف خط شحن وتخليص خاصاً بها، فاجعل التجزئة في خدمة خطة الإطلاق.
أسابيع الخياطة للموسم تُوزَّع قبل أشهر، والأسابيع بين اليوم وديسمبر تحدد ما يبقى متاحاً في يناير. أرسل موديلاتك وكمياتك عبر صفحة عرض السعر أو تواصل معنا مباشرة، واحتفظ بـتقويم رمضان 2027 إلى جانب ورقة تخطيطك.